Year: 2023 | Month: November | Volume: 10 | Issue: 11 | Pages: 73-82
DOI: https://doi.org/10.52403/ijrr.20231109
Effect of Implementation of Performance Risk Management on High Rise Building Structure Work (Junction City Building)
Mahliza Nasution
Department of Civil Engineering Universitas Medan Area, Medan, Indonesia
ABSTRACT
There are risks in every construction project, uncontrolled risks will become a problem and cause losses to the project due to cost overruns and delays in work execution. Therefore, to manage risk, it is necessary to carry out risk management so that the project can survive, or perhaps optimize risk. The purpose of this study was to determine the dominant risk factors, how big the level of risk that occurred and the response given to the dominant risks of cost and time performance in the structural work of the Grand Jati Junction Apartment Development project. From the results of this study, it was found that 8 factors became the dominant risk factors with varying (different) levels depending on the complexity of the work and the conditions at the time of implementation of each stage of the work. Then from the results of the risk factor analysis, a risk response is obtained in the form of preventive measures to prevent or minimize these risks.
Keywords: Risk Management, Building Structure Work.
[PDF Full Text]