Design And Build Project Risk Analysis at Tugu Pal 0 Stage II Project Construction
Ryan Tirta Nugraha1, Aqli Mursadin2
1,2Construction Management Master of Civil Engineering Study Program, Faculty of Engineering, Lambung Mangkurat University, South Kalimantan, Indonesia
Corresponding Author: Ryan Tirta Nugraha
ABSTRACT
The implementation of the design and build method in the Phase II Pal Nol Monument construction project, managed by the Public Works and Spatial Planning Agency (PUPR) of South Kalimantan Province, aims to analyze the risks associated with the design and construction processes. This project, which utilizes an integrated design and build construction method (multi-year), is located on Jl. Dharma Praja within the South Kalimantan Provincial Office Area and executed by the contractor KSO ADHI-PUTRA. A comprehensive risk mitigation strategy for the project includes detailed work planning, effective coordination, periodic evaluation, a thorough understanding of design specifications, continuous risk analysis, flexible contingency plans, and strong communication with government entities and stakeholders.
Keywords: Risk Analysis, Design and Build, Construction, Tugu PAL 0 Stage II