Key Success Factors: Application 6D BIM to Reduce Initial Cost, Operational Cost & Maintenance Cost in Project Façade High-rise Office using RII Method
Paulus Praja Credana1, Budi Susetyo2
1Postgraduate Student of Master Civil Engineering, Mercu Buana University, Jakarta, Indonesia,
2Lecturer of Master Civil Engineering, Mercu Buana University, Jakarta, Indonesia.
Corresponding Author: Paulus Praja Credana
ABSTRACT
The application of 6D BIM and value engineering in a project is still very rarely studied because BIM is still a new discussion in the project planners' field. The key to the success of implementing BIM 6D is influenced by several factors which will be explained in this study. The purpose of this study was to determine the success factors for applying BIM 6D value engineering to the Façade project of high-rise office buildings in terms of reducing design costs, operating costs, and maintenance costs. Office Building. This factor will be a focus for stakeholders, especially the Office Building Façade project in Indonesia.
Keywords: BIM 6D, building façade, Office building, RII.