Case Study
Year: 2021 | Month: April | Volume: 8 | Issue: 4 | Pages: 61-69
DOI: https://doi.org/10.52403/ijrr.20210410
A Case Study on Assessment Performance and Energy Efficient Recommendations for Industrial Boiler
Pratik M. Joshi1, Shekhar T. Shinde2, Kedarnath Chaudhary3
1Student, 2Assistant Professor, 3M.Tech,
Mechanical Engineering, Bharati Vidyapeeth (Deemed to be University), College of Engineering,
Pune, Maharashtra
Corresponding Author: Shekhar T. Shinde
ABSTRACT
As India is a developing country, industrialization is increasing day by day and there is a great need for industry energy audit. Audit helps to maintain and save energy from being wasted and helps in achieving highest efficiency of industrial equipment. This paper contains an actual industry audit report on boiler performance. This paper contains a report on Thermal analysis of boilers, thermal skin heat loss of boilers, O2 percentage control in flue gases to standard values, effect of coal additive, etc. This paper also contains a report on waste heat recovery options for thermal boiler, flue efficiency monitor, infrared thermometer, ultrasonic peak detector IR thermal imager. These equipment are used for energy assessment of boilers. Thermography survey of boiler surface is carried out to estimate the radiation and the other losses and the result of this total annual saving after insulation repairing or maintenance is Rs.8.48 lakh and investment is around Rs.6.31 lakh. Economizer performance of both the ISGEC and Thermax boiler can be improved with the help of suggested measures. It will help to save approximately rupees Rs.38.42 Lakh annually and investment on maintenance cost is negligible. In short, this paper deals with assessment of all boilers, evaluates their efficiencies and losses to identify energy saving opportunities and presents them in a report with their payback periods.
Keywords: Energy, Energy audit, assessment, boiler.
[PDF Full Text]